China National Standards
China Operation of receivi GB Standards Search System  


 China "TB/T 1500.1-2009" standard english version information:

1. China TB/T 1500.1-2009 Standard Chinese version, you can purchase directly online; After receive your payment, we will send the GB Standards PDF file to your Email within 24 Hr.
2. China TB/T 1500.1-2009 Standard English version is not ready-made,only after get your order, then we translate them, time usually need 3-5 days. Detail refere: "How to purchase the English version China GB Standards?"
Item Content
GB Standard  Code TB/T 1500.1-2009
GB Standard Class China Railway & Train Standard
GB Standard English Title Operation of receiving departing trains. Part 1: On double lines with auto-blocking and centralized interlocking (with signalman)
GB Standard Chinese Title
Applicable Category China Railway & Train-Railway & Train
Chinese Version Price $15 USD per 50 pages
English Translation Price About $15  per 1 page; Detail enquire us for
Order
China "TB/T 1500.1-2009" Standard english version Add to Cart
Note The TB/T 1500.1-2009 standard english translation Prepayment unit $100 USD, is not mean this TB/T 1500.1-2009 standard english version price is $100 USD, it is only a basic unit of prepayment for translation, The actual translation fee and prepayment are depend on the amount of TB/T 1500.1-2009 standard Chinese words, We request 80% prepayment of the total translation fee.
For example, if the GB standard english price is $500, you need pay $400 prepayment, Four Quantities of the $100 prepayment unit.
  •  Relational standard of TB/T 1500.1-2009;    
  • Standard  Code GB Standard Title
  • TB/T 1500.3-2009
  • Operation of receiving and departing trains. Part 3: On single and double lines with semi-auto-blocking and centralized interlocking(with signalman)
  • TB/T 1500.2-2009
  • Operation of receiving and departing trains. Part 2: On double lines with auto-blocking and centralized interlocking(without signalman)
  • TB/T 1500.5-2009
  • Operation of receiving and departing trains. Part 5: On signle and double lines with semi-auto-blocking and colorlight electric interlocking
  • TB/T 1500.4-2009
  • Operation of receiving and departing trains. Part 4: On single and double Lines with semi-auto-blocking and centralized interlocking(without signalman)
  • TB/T 1500.1-2009
  • Operation of receiving departing trains. Part 1: On double lines with auto-blocking and centralized interlocking (with signalman)
  • TB/T 1500.8-2009
  • Operation of receiving and departing trains. Part 8: On signle-lines auto-blocking and centralized interlocking between stations(without signalman)
  • TB/T 1500.7-2009
  • Operation of receiving and departing trains. Part 7: On signle-lines auto-blocking and centralized interlocking between stations(with signalman)
  • TB/T 1500.6-2009
  • Operation of receiving and departing trains. Part 6: On single and double lines with telephone block and without interlocking
  • JT/T 673-2006
  • Requirements of receiving and disposing demands of units/enterprises operating shipFs pollutants disposal and tank cleaning operation
  • TB/T 1503-2003
  • Standards of Operation of receiving and departing trains on single and double lines with semi-auto-blocking and centralized interlocking (without signalman)
     
     

    +86-400-6578191        info@transcustoms.com 
    106# Zhongmao Mansion,No.1 Beizhan Road,Shenzhen,China
    ©  RJS Copyright  2001-2017 All Rights Reserved


    www.GBstandards.org